Residents tell River Ridge board plugged inlet left Pinehurst ponding and flood risk; engineer to study
Jul 23, 2024
Residents warned of ponding and near‑flood conditions at Pinehurst after a plugged inlet; the district engineer said the original cross‑connection was addressed but additional study and photographic/video evidence are needed and staff will arrange an inspection.
The full story
Resident Shari Perkins told the River Ridge Community Development District Board on July 23 that, a week after a street inlet was plugged, drainage problems persist "and water has been overflowing in the triangle monument area," and that a retention pond between River 8 and River 9 appears nearly 1 foot above the drain, raising flood concerns.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →