Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Contracts topic
No spam. Unsubscribe anytime.
Luther Board approves structural engineering services with Wallace Design Collective
Summary
The board approved a proposal to retain Wallace Design Collective for structural engineering services after a motion by Nick Fletcher; the vote was unanimous.
Get email alerts on the Contracts topic
No spam. Unsubscribe anytime.
The Luther Board voted Sept. 8 to approve a proposal for structural engineering services with Wallace Design Collective. Nick Fletcher moved to approve the proposal; Marcellus Fields seconded the motion and the minutes record a 4-0 vote in favor.
The minutes note only the vendor name and the formal motion; the record does not include the contract dollar amount or term. The motion in the minutes reads, "Motion to approve this item as read." The boardapproval authorizes administration to proceed with contracting steps consistent with the proposal they considered in closed and open session.
