Citizen Portal

Get email alerts on the Water Infrastructure topic

No spam. Unsubscribe anytime.

Council authorizes BOSS Engineering to update water reliability study for EGLE compliance

Walled Lake City Council · July 22, 2026

Summary

Council approved BOSS Engineering to update the city’s 2017 water reliability study as required by EGLE; staff said the work is budgeted under civil engineering services for the fiscal year.

City staff requested authorization for BOSS Engineering to update the city’s water reliability study, a requirement tied to the MS4 permit review and EGLE rules. The city representative said BOSS Engineering’s proposal is included in the packet and that the expense is part of the civil engineering services budget for the fiscal year.

Council discussed how the study differs from prior sanitary system inspections and asked staff to clarify whether the work includes meter reads and infrastructure condition assessments; staff confirmed the study focuses on the water supply system (pipe condition, hydrants, valves and operational readiness) and that WRC reads meters on the city’s behalf. Council moved and approved resolution 22026‑20 to authorize BOSS Engineering to proceed.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source