Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Pool Abatement topic

No spam. Unsubscribe anytime.

Wakefield staff: existing pool abatement may overlap with second-meter program

Wakefield Utilities Advisory Board · July 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff told the advisory board the town currently offers sewer abatements for new pools or liners and that widespread adoption of irrigation second meters could render that abatement unnecessary for those customers; staff will evaluate interactions when drafting policy.

Board members and staff discussed how the long-standing pool sewer-abatement practice would interact with any new second-meter irrigation program. Joe (staff member) described the current practice: if a household installs a permitted new pool or new liner, the sewer charge for the pool fill is deducted from the sewer bill as an abatement.

"If you have a pool, you have a building permit for your pool... they'll take the dimensions of your pool and for a fill, a sewer charge will be deducted from that," Joe said. He advised that if second meters are implemented for irrigation, customers who install a second meter would no longer need to request a separate pool abatement, because outdoor water would be measured off the sewer basis. Staff said they will include the pool-abatement interaction in the draft projections and policy language returned to the board after Labor Day.