2045 system analysis identifies targeted hydraulic upgrades and power-gap risks

Tampa Bay Water Board of Directors · July 23, 2026

Summary

A 2045 hydraulic and emergency-scenario study recommended implementing eight capacity and resilience concepts — prioritizing Cypress Creek repump mode and several booster-pump upgrades — and flagged projected backup-power shortfalls by 2045 that require generator and coordination improvements.

Tampa Bay Water staff presented a 2045 hydraulic and emergency-scenario analysis that modeled system performance through 2045 and identified reliability and resilience investments the authority should consider. Eliana Lara, the senior professional engineer, said the analysis identified eight capacity and resilience concepts and recommended a short list of prioritized measures, including implementing a Cypress Creek repump mode and upgrading booster pumps and motors at key pump stations.

The analysis also assessed power-outage scenarios and found a projected deficit in backup power capability in 2045. Lara recommended steps such as increased generator capacity at key facilities, improved remote monitoring and control of backup power systems, changes in generator ownership/operation where appropriate, and enhanced coordination with electric-utility providers to close identified gaps.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source