Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Commission authorizes SDDOT JPA acknowledgment; approves bridge work to proceed
Summary
County commissioners authorized the chairman to sign an SDDOT Joint Powers Acknowledgment for a highway project involving a large box culvert and voted to proceed with work on bridge #44-010-185 despite a minor girder sweep issue described as cosmetic by engineers and the contractor.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Scott Nelson, Right-of-Way Specialist for the South Dakota Department of Transportation, presented a Joint Powers Agreement for a highway project from Exit 350 (SD25) to four miles west of Exit 364 and explained the county acknowledgment required for placement of a large box culvert. The Commission approved a motion authorizing Chairman Charles Liesinger to sign the Acknowledgment.
Later, Adam Polley of engineering firm IMEG and Highway Superintendent Travis Raap reported a minimal "sweep" issue with the girders on bridge #44-010-185. Polley said the condition is cosmetic and would not affect the bridge’s service life or load capacity; the contractor, Holloway Construction, described the issue similarly. The Commission voted (motion by Commissioner Chuck Mehlbrech) to proceed with the bridge project rather than requiring recasting of the girders.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
