Pre-construction plan set for Road 1010 bridge replacement; Notice to Proceed April 20
Apr 21, 2026
Interstate Engineering and Bishop Inc. presented plans to replace a 26-foot timber bridge with a 25'5" x 10'2" aluminum box culvert, with a Notice to Proceed on April 20 and substantial completion targeted for May 18, 2026.
The full story
John Bach of Interstate Engineering outlined a pre-construction plan to replace a 26‑foot timber bridge on Road 1010 with an aluminum box culvert measuring 25 feet 5 inches by 10 feet 2 inches. Bach reported a 30‑day completion timeline, with Notice to Proceed scheduled for April 20, 2026, and substantial completion targeted for May 18, 2026. Construction responsibilities include compliance with local, state and federal regulations, site safety, dewatering using pumps and an earthen dam, and ballast material for structural fill consistent with prior projects.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →