Summary
The Road & Bridge update covered December operations, pending FEMA public works (PWs), a submitted reimbursement request of approximately $799,500, about $381,000 expected to move soon, and engineering needs for two complicated sites that may require outside contractors.
Get email alerts on the Infrastructure Recovery topic
No spam. Unsubscribe anytime.
Road & Bridge staff presented the monthly operations report and plans for FEMA projects, telling the court that in December they closed 25 work orders and currently have 26 pending. Staff reported routine maintenance including blading, culvert work, sign installations and brush clearing, and said they are preparing three FEMA projects for bidding.
On grant reimbursements and PWs, staff said they submitted documentation for DR4781 and expected approximately $799,500 to be processed for reimbursement; they also said another package of PWs totaling roughly $381,000 should move from federal to state processing soon. Staff estimated there remain roughly a dozen PWs and that completing all recovery projects could require about $4.5 million, with two sites needing outside engineering help. The court discussed options to split the larger, engineering‑heavy sites into their own packages and possibly use a $100,000 engineering loan/package to advance design work.
Mister Latham summarized the operations: “For the month of December, we had 46. We closed out 25 work orders. We have 26 pending currently.” The County Judge thanked staff and accepted the report after a motion from a commissioner; the court approved the acceptance by voice vote.