Residents ask River Ridge board to consider Seaside-style regrading to ease Lake 8 flooding
Jan 28, 2025
An Oak Run resident told the River Ridge CDD board that rainwater pooling near Lake 8 is slow to recede and is suspected of getting under foundations; the district engineer said regrading similar to recent Seaside work could address the issue and the board will consider it in the FY 2025/2026 budget.
The full story
Rich Batterberry, speaking for Oak Run residents, urged the River Ridge Community Development District board to consider remedial work near Lake 8 after rainwater pooling from the monument to halfway down Lake 8 has been slow to recede. Batterberry told the board that one homeowner incurred significant costs trying to mitigate water coming up through the floor.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →