Select Board: ADA path required; hydrological study will inform zoning review
Nov 14, 2024
Organizers said the pavilion will include an ADA-compliant path and that a hydrological consultation and culvert study are underway to address water concerns raised by residents; results will be shared with the zoning board of adjustment.
The full story
Accessibility and potential water/drainage impacts were prominent technical concerns raised at the meeting. Melody Squire told the group that the project "is required to have an ADA path, so we will have a path about 3 feet wide that will most likely be Sure Pack" and that the floor material being discussed is also SurePack. Residents pressed whether the surface would be appropriate for wheelchair access and whether water standing in the nearby low area could cause issues.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
