Applicant proposes mobile-home replacement above base flood elevation; board closes hearing

May 11, 2026

The board closed the public hearing for Tom Koch’s request to replace a mobile home in the flood zone after the applicant’s agent said the new unit will be built 2.5 feet above base flood elevation, use breakaway walls and meet floodplain conditions; the Flood Plain Manager flagged a footprint-location requirement.

The full story

The Ludlow DRB heard testimony and technical conditions for a full replacement of an existing mobile home at 96 Buttermilk Falls Road (FHR-26-001; CU-26-001) and then closed the public hearing on May 11. Staff member Erin Ladd said required public notices were posted; agent Brendan McNamara told the board the proposed unit would have its first floor 2.5 feet above the base flood elevation, a buried and anchored propane tank, breakaway walls, and other flood-resistant features.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in