Council approves $61,811 CDC-funded replacement for sagging shade at Doubletree Ranch

Jun 23, 2026

Council authorized $61,811 from the Highland Village Community Development Corporation (4B) to replace a sagging shade fabric structure at Doubletree Ranch with a four-post 30x30 sail system after discussing alternatives including trees, rip-out/re-sod and warranties; vote carried 4–1.

The full story

Council approved Resolution 2026-3241 authorizing CDC funding for replacement of the problematic chessboard shade structure at Doubletree Ranch after staff presented options and CDC's prior recommendation. Staff told council the existing fabric had been replaced in 2023 for $12,000 but sagged and was vandalized; the CDC recommended a single four-post, 30-by-30 shade system at a cost of $61,811. "The shade fabric was replaced in 2023 at the cost of $12,000 and has already been vandalized again and had to be removed," a parks presenter told the council as she outlined options that ranged from planting trees ($12,762–$17,612) to full demolition and replanting ($36,900–$41,819).

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in