Citizen Portal

Get email alerts on the Well Replacement topic

No spam. Unsubscribe anytime.

Board ratifies engineering proposal for Goodwill Road well replacement

Board of Supervisors for Consolidated Waterworks/Sewerage District No. 1 of the Parish of Bossier · June 17, 2026

Summary

The board ratified a proposal from Cothren, Graff, Smoak Engineering, Inc., for professional design services for Project No. 2026-123 (Goodwill Road at Highway 80, Well No. 29 - Well No. 23 Replacement); the Police Jury approved the resolution June 17, 2026.

The Board ratified a proposal from Cothren, Graff, Smoak Engineering, Inc., to provide professional design services for Project No. 2026-123 (Goodwill Road at Highway 80, Well No. 29 - Well No. 23 Replacement). The motion to ratify was made by Doug Rimmer and seconded by Ms. Glorioso; the board voted 11 yes, 0 no, with one member absent.

The transcript records a Police Jury resolution authorizing the Parish Administrator/Parish President to execute documents related to the design services. Ratification allows the parish to proceed with design and permitting steps for the well replacement under the named engineering firm.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source