Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Higgins Lake topic

No spam. Unsubscribe anytime.

Consultants step back from Higgins Lake project; board says study needed before flow changes

Roscommon County Board of Commissioners · May 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Commissioners reported that Prein & Newhof, Wade Trim and OMH declined further work on Higgins Lake; Chair Sensor said she consulted James Tiffany and the board discussed possibly reducing a 50 cfs flow outside spawning season but agreed a study is required.

During the May 13 special session, Chair Darlene Sensor told commissioners that Prein & Newhof will no longer work on Higgins Lake and that Wade Trim and OMH also expressed no interest. Sensor said she met with James Tiffany, who will review the materials and provide a determination.

Commissioners discussed the goal of a structure enabling year-round lake-level maintenance and debated a possible reduction of the 50 cubic-foot-per-second flow during non-spawning periods. Board members said such a change would require a formal study before any action could be taken.