Engineer says stormwater system held but resident reports possible mold from standing water
Aug 27, 2024
District engineer reported stormwater systems reached capacity but flowed unobstructed after Tropical Storm Debbie; one resident said standing water is seeping into a slab and causing mold, which the engineer said he does not believe based on other units’ reports and asked staff to address at a future meeting.
The full story
District Engineer Charlie Krebs reported the Pinehurst valley gutter inlet grate replacement project is about 80% complete and described system performance after Tropical Storm Debbie: "Parts of the community received almost 8” of rain in two or three days and the roads are designed for 5½” of rain over a 24-hour period," he said, noting the systems reached capacity but flowed unobstructed.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →