Design includes triage room, training tower and storage lofts
Jul 28, 2026
Jul 28, 2026
Architects detailed interior features including a triage room for on‑site medical intake, a hose/tower designed for wet training, loft storage in apparatus volume, and on‑site training areas for ladder and high‑angle rescue.
The full story
The schematic includes specific operational features for firefighters: a triage room adjacent to the public lobby for immediate medical intake, a training tower configured as a stair that allows wet training without damaging the interior, and loft storage in apparatus volume where structurally feasible.
