Operator reports two grinder pump call-outs; pumps replaced
Summary
The operator reported two grinder pump call-outs at McMillan Road and South Erie Street and said both pumps were replaced. The board recorded the maintenance activity in the operator's report.
Get email alerts on the Operations topic
No spam. Unsubscribe anytime.
In the operator's report the authority recorded two grinder pump call-outs and subsequent pump replacements.
The minutes state: "There were (2) grinder pump call outs. McMillan Rd. and South Erie St. Pumps were replaced." The operator logged the service events and replacements as part of routine maintenance; no additional costs or warranty issues were recorded in the minutes.
The board accepted the operator's report as part of the meeting's routine business.