Buchanan Splash Pad features installed; Health Department inspection scheduled
May 18, 2026
Parks Director Toby Berry reported the Buchanan Splash Pad features are installed, tanks filled and chemicals regulated; a cracked control valve is being temporarily repaired pending part replacement and the Health Department approved the temporary plan with an inspection scheduled for Friday.
The full story
Parks Director Toby Berry told the Fiscal Court that the Buchanan Splash Pad features have been installed, tanks are filled and chemical levels are being regulated. Berry reported two cracks in a control valve; he fabricated a temporary valve to keep the feature operational until a replacement part arrives. The Health Department has approved the temporary plan and an inspection was scheduled for Friday.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →