Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Tap Fees topic
No spam. Unsubscribe anytime.
Authority publishes connection and tap fees; increase for developments using public sewer pumping stations
Summary
The preliminary availability, connection and tap fees include a 5/8"/3/4" connection charge of $1,200, a tap charge of $2,550 for the same meter size, and a $1,000 per-residential-connection increase for developments using publicly owned sewer pumping stations.
Get email alerts on the Tap Fees topic
No spam. Unsubscribe anytime.
The Patrick County Public Service Authority's Schedule of Availability, Connection & Tap Fees sets connection and tap charges by meter size and includes multiple notes affecting developers and third-party constructions. For example, a 5/8" or 3/4" meter is shown with a current connection charge of $1,200 (equivalent residential unit 1.00) and a current tap charge of $2,550. The schedule states meters larger than 4" are charged at contract rate and that for developments constructed utilizing publicly owned sewer pumping stations, the connection fee will increase by $1,000 per residential connection.
Additional notes specify that meters up to 5/8" and 3/4" constructed by others will be billed at $195 each and larger meters billed at cost plus 10%; tap fees may be increased to cover pavement restoration or road-crossing costs and extension fees may apply for offsite projects, as determined by the Authority's Executive Director. These charges are labeled preliminary with a proposed effective date of July 1, 2026.
