Board defers controller replacement, weighs SCADA readiness pending well inspection

May 13, 2026

The Board reviewed two quotes to replace mercury switches in pump-house controllers—one basic replacement and one SCADA-ready option—and deferred purchase until after a well pump inspection; engineering said full SCADA additions for water sites could cost $25,000–$50,000 per site.

The full story

Director of Public Works Keith Leitzinger presented two quotes for replacing mercury switches in pump-house controllers: a basic functional replacement from B&M Electric and a Pilling quote configured for SCADA integration and telemetry readiness. Engineer Jordan Fure advised the Board that adding full SCADA capability to water system sites could add about $25,000–$50,000 per site, and suggested deferring the controller decision until the condition of the well is known following a pump pull inspection.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in