Board defers controller replacement, weighs SCADA readiness pending well inspection
May 13, 2026
The Board reviewed two quotes to replace mercury switches in pump-house controllers—one basic replacement and one SCADA-ready option—and deferred purchase until after a well pump inspection; engineering said full SCADA additions for water sites could cost $25,000–$50,000 per site.
The full story
Director of Public Works Keith Leitzinger presented two quotes for replacing mercury switches in pump-house controllers: a basic functional replacement from B&M Electric and a Pilling quote configured for SCADA integration and telemetry readiness. Engineer Jordan Fure advised the Board that adding full SCADA capability to water system sites could add about $25,000–$50,000 per site, and suggested deferring the controller decision until the condition of the well is known following a pump pull inspection.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →