Get email alerts on the Transportation Infrastructure topic
No spam. Unsubscribe anytime.
Arnold Road closed for bridge replacement; Springer Bridge preparations discussed
Summary
Road and Bridge advised that Arnold Road will be closed for bridge replacement effective Aug. 18. Foreman Mike Reasoner reported on a smashed culvert, potential mower purchase, and preparatory work for Springer Bridge BRO-R108(45).
Get email alerts on the Transportation Infrastructure topic
No spam. Unsubscribe anytime.
Road and Bridge notified the commission that Arnold Road, between 550 Road and 650 Road in Sections 25 and 36 of Henry Township, was closed for bridge replacement effective Monday, Aug. 18; emergency, school and township officials and media were emailed the notice.
Road and Bridge Foreman Mike Reasoner met with the commission to report on a smashed culvert on Union Track Road in Drywood Township, discuss the possible purchase of a new MowerMax mower, and identify work needed to prepare for construction of the Springer Bridge project BRO-R108(45). Tammy Bobbett was cited as the source of information about the culvert.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
