Citizen Portal

Get email alerts on the Mobile Command Vehicle topic

No spam. Unsubscribe anytime.

County approves $2.45M for Mobile Command Vehicle replacement and garage design

Orange County Ways and Means Committee · March 31, 2026

Summary

Legislators approved $2.4M to replace a 2005 Mobile Command Vehicle used for major incidents and $50,000 for engineering and design of a new Emergency Services garage to store grant-funded equipment; the garage would be a 56' x 96' three-bay building behind the 911 Center.

The committee approved $2.4 million bonding (Project No. 31) to replace the county’s Mobile Command Vehicle (MCV). Vini Tankasili, Deputy Commissioner of Emergency Services (Fire Services), said the existing vehicle was built in 2005 and is "integrated and due for replacement," explaining it supports incident command, communications and planning for large-scale incidents including Jennings Creek and the Farmingdale bus accident.

Separately, the Legislature agreed to assume lead agency under SEQRA for an Emergency Services garage in the Town of Goshen and issued a Negative Declaration; the committee approved $50,000 (bonding) for engineering and design (Project No. 30) for a proposed 56' x 96' three-bay garage to store grant-funded equipment and protect operational readiness in severe weather. Tankasili confirmed the garage would accommodate the new Mobile Command Vehicle.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source