Board reallocates funds for generator upgrades, citing code and long-term maintenance

Jan 22, 2026

Supervisors approved reallocating about $33,767 to address code-related and maintenance upgrades for generators at Vernon Manor and Vernon Acres, including $12,000 to replace buried aluminum conduit with copper and small additions for testing switches and annunciator panels.

The full story

Facilities staff explained that code updates and long-term maintenance considerations require reallocation of unassigned funds to complete generator upgrades at Vernon Manor and Vernon Acres. Key cost drivers include replacing buried aluminum conduit with copper — estimated near $12,000 — a new annunciator/control panel and an $800 load-testing switch that would simplify future maintenance and testing. The worst-case reallocation request was $33,767.26, accounting for potential conduit or wiring replacements.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in