Residents urge River Ridge board to address Lake 8 flooding as foundation damage reported
Jan 28, 2025
Jan 28, 2025
Oak Run residents praised Seaside repairs and asked the River Ridge board to consider similar work near Lake 8 to stop prolonged pooling that residents say is reaching foundations; the board said it will consider the project in the FY2025/2026 budget.
The full story
Rich Batterberry, representing Oak Run residents, told the River Ridge Board that remediation work done at Seaside 1 and Seaside 2 was received "very favorable" and urged the district to consider similar measures around Lake 8 to address long-lasting pooled rainwater.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
or
Free account
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →