Get email alerts on the Public Works topic
No spam. Unsubscribe anytime.
Public works removes raised crosswalk material after safety concern at 9th & Hazel
Summary
After a public comment about a reported injury at the 9th & Hazel crosswalk, public works staff inspected the location, removed the problematic material and smoothed the roadway; staff said further measures will be evaluated if warranted.
Get email alerts on the Public Works topic
No spam. Unsubscribe anytime.
A member of the public raised concerns about the 9th & Hazel crosswalk after an apparent injury caused by a raised thermal‑plastic crosswalk surface. Public works staff investigated and removed the crosswalk material that had created a bump and smoothed the roadway.
City staff said they were evaluating additional actions the city could take, including addressing truck noise and other community requests, and would determine any further warranted improvements after the review.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

