Public works removes raised crosswalk material after safety concern at 9th & Hazel

Jul 28, 2026

After a public comment about a reported injury at the 9th & Hazel crosswalk, public works staff inspected the location, removed the problematic material and smoothed the roadway; staff said further measures will be evaluated if warranted.

The full story

A member of the public raised concerns about the 9th & Hazel crosswalk after an apparent injury caused by a raised thermal‑plastic crosswalk surface. Public works staff investigated and removed the crosswalk material that had created a bump and smoothed the roadway.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in