County reports road repairs, patching backlog and equipment updates
Summary
Roads staff reported active limestone, repair, patching, tree trimming and ditch cleanup across multiple county roads; the Durapatcher is in the shop and crews are short-staffed with about 20% of workforce on leave.
Roads and bridge staff updated the court on ongoing maintenance and equipment status across the county.
A county representative detailed work on County Roads 1136, 798, 2095, 22, 647, 1664, 732, 1345, 1839, 709, 852, 908, 629, 1441 and 2289, listing limestone application, ditch cleanup, tree trimming and finish work. Staff said a grapple truck and a Durapash truck were active in several areas.
"We have, exceeded 9 30 potholes in the last couple weeks after all the rains and everything else, and our Durapatcher is in the shop," Mason Zagarski said, noting the patcher would return to service when repaired. Staff also reported about 20% of the workforce was on vacation or sick, slowing response and patching operations.
The court accepted the operational update; no separate action was required.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
