Committee accepts Kartechner and WK Construction bids for CTH J LRIP work
Summary
The Marquette County Highway Committee approved Kartechner for asphalt materials (4MT $45.35; 5MT $48.35) and WK Construction for cold-in-place recycling and milling (segment total $346,780) for the 2025 CTH J LRIP project.
At the April 15 meeting, staff reported receiving four asphalt bids and recommended Kartechner as the lowest-cost supplier when trucking was factored. The minutes record unit prices of $45.35 per ton for 4MT and $48.35 per ton for 5MT. WK Construction was the sole bidder for cold-in-place recycling and matched Tri County on the milling segment; the minutes list the total price for that segment as $346,780.
John Bennett moved to accept Kartechner and WK Construction for the 2025 CTH J project; Dave Benson seconded the motion, which the minutes record as carried. The committee did not provide a roll-call tally in the minutes. Staff was directed to proceed with vendor agreements and scheduling.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
