Committee delays Kalejo Drive stop-sign study until traffic stabilizes
Jul 21, 2026
Jul 21, 2026
Staff recommended waiting about six months after Kalejo Drive construction is complete before conducting a stop-sign study; construction is expected to finish around October, which points to a possible study window in March–April next year.
The full story
The Transportation Infrastructure and Mobility Committee discussed whether to study installing stop signs on Kalejo Drive and heard staff recommend delaying a study until traffic has stabilized after construction.
