Board hears facility update; district to verify bus loop and flooring work
Mar 18, 2026
District staff reported on facility issues including cleaning grates, verifying bus loop crack repairs (Class 5 material tested and passed), separation on wall cracks, and confirming flooring installation.
The full story
During the facility update, Superintendent Nathan Libbon reported on a recent meeting with P. Brenden and Brandon of A&P to review parking-lot and building work. The board was told grates in the parking area need cleaning at least twice a year, that cracks in the bus loop should be verified for correct installation (Class 5 material was tested and passed), that some separation exists along a wall, and that flooring installations will be double-checked.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
