Board hears facility update; district to verify bus loop and flooring work
Summary
District staff reported on facility issues including cleaning grates, verifying bus loop crack repairs (Class 5 material tested and passed), separation on wall cracks, and confirming flooring installation.
Get email alerts on the Facilities Maintenance topic
No spam. Unsubscribe anytime.
During the facility update, Superintendent Nathan Libbon reported on a recent meeting with P. Brenden and Brandon of A&P to review parking-lot and building work. The board was told grates in the parking area need cleaning at least twice a year, that cracks in the bus loop should be verified for correct installation (Class 5 material was tested and passed), that some separation exists along a wall, and that flooring installations will be double-checked.
The minutes capture these facility observations and planned verifications but do not record a formal motion or schedule for repairs. The board later scheduled a Facility Committee meeting for April 13 to continue oversight.