District contractor/presenter Raj Patel reported site work is complete, grade beams and fire-lane installed, the first metal components arrived and structure construction will begin; paving and parking work are underway and sidewalks are scheduled in two to three weeks.

At the Sept. 8 meeting Raj Patel provided an update on the MPSC construction project, reporting that all site work around the building is complete, including grade beams and fire-lane installation. He said the first truckload of metal building components has arrived and that structural construction would begin shortly.

Patel summarized paving and parking progress, reported that a borrow hole had been filled to create additional flexible parking space, and said sidewalk installation was scheduled to begin in two to three weeks. The presenter showed photos of site paving, level grading and beam work. The minutes record these construction-status details but do not include a drawn timeline or completion date.