Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Staff: Cedars Section 2 replat splitting Lot 4 into Lots 3A and 5A meets setbacks, no protests

Grimes County Commissioners Court · September 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County staff reported that a proposal to split Lot 4 into two separate lots (creating Lots 3A and 5A) in Cedars Section 2, Block 2 (Precinct 2) meets regulatory requirements; no audience protests were recorded during the public hearing.

A proposed replat in Cedars Section 2 (Block 2) to divide Lot 4 into two separate parcels and create Lots 3A and 5A was presented to the Grimes County commissioners Sept. 3, 2025. Staff told the court the replat meets county regulations and had no neighborhood objections.

Sean King, development coordinator, explained that adjacent residents own Lots 3 and 5 and that they jointly acquired Lot 4 before splitting it; he confirmed the subdivision conforms with county setback and septic rules. Chair called for speakers on the item; none came forward during the public comment checks recorded in the hearing.

The hearing transcript contains no recorded protests or formal votes on this specific replat; the court adjourned the public hearing after routine business concluded.