Centertown board selects Great River Engineering for $36,000 sidewalk TAP project

Village of Centertown Board of Trustees · October 28, 2025

Summary

Trustees authorized Chairman Debra Baker to sign a financial agreement with Great River Engineering for a $36,000 Sidewalk TAP grant after a voice vote. The board’s action moves the grant project into the engineering phase.

The Village of Centertown Board of Trustees voted Oct. 28 to retain Great River Engineering to design a sidewalk project funded through a $36,000 Transportation Alternatives Program (TAP) grant and authorized Chairman Debra Baker to sign the financial agreement.

Trustee Paula Hinshaw moved to authorize the agreement, and Trustee Heather Hunger seconded; the motion passed on a voice vote. The decision advances the sidewalk TAP project from grant award toward engineering and later construction phases, with Great River Engineering slated to complete the design work and related financial paperwork.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source