Board orders engineering review, escrow for High Ridge/High Timber abbreviated site plans

May 11, 2026

The board agreed to set up an engineering-review escrow and forward revised drawings to the town engineer for two related abbreviated site-plan applications at High Ridge/High Timber Farm after members found inconsistent maps and missing grading/contour details.

The full story

The board reviewed two related abbreviated site-plan applications (two lots often called dot-3 and dot-4) that showed inconsistent map labels and lacked necessary scale and contour information for driveway grades and septic design. Members said they could not perform a meaningful review without revised, full-scale drawings and a proper set of contours and asked the applicant to provide corrected site plans.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in