Citizen Portal

Get email alerts on the Facilities topic

No spam. Unsubscribe anytime.

Pampa ISD tables architect authorization for PHS track replacement until October

Pampa ISD Board of Trustees · September 23, 2024

Summary

The board did not approve architect agreement language for the Pampa High School track replacement; Shiver-Megert is the district architect and will engage CEI Engineering as a consultant, but the proposed agreement is incomplete and the item was tabled to the October meeting.

The Pampa ISD board heard a request Sept. 23 to authorize additional services from the district architect, Shiver-Megert, to design and supervise replacement of the Pampa High School track, but the item was tabled until the October meeting because the proposed agreement with CEI Engineering was not complete.

Angel Grant explained the statutory requirement that an engineer prepare plans and supervise construction for public works involving public health and safety (citing Texas Occupations Code). The minutes state that Shiver-Megert will hire CEI Engineering as a consultant on the project and that the administration and district attorney are still finalizing the proposed agreement. Mrs. Grant requested the item be tabled until October; the minutes show no board action on authorization at this meeting.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source