Board accepts several maintenance contractor proposals, postpones Moore Engineering
Feb 18, 2025
The board approved Schmitz Excavating equipment rates (one abstention), accepted gravel hauling and dust-control quotes, discussed KRIS plow-edge quote without ordering extras, and postponed a Moore Engineering proposal until the next meeting.
The full story
Vice Chair Brandon Geyen moved to accept Schmitz Excavating's equipment-rate proposal; Supervisor Ryan Nelson seconded, Supervisor Andy Christensen abstained, and the motion carried with a 3-0 tally and one abstention. The board discussed a KRIS Engineering quote for plow edges and declined to order extra plow edges at this time.
Geyen moved to accept Bjorklund Companies' gravel-hauling quote and to accept Central MN Dust Controls' estimate; both motions were seconded by Nelson and carried 4-0. A Moore Engineering proposal was postponed until the next meeting. Chairman Mike Helman also moved to approve up to $150 for a maintenance meeting; that motion was seconded by Geyen and carried 4-0.
Written with AI from the event video and transcript. Check it against the source ↓
