Board approves Holiday Mountain pole-barn storage modification

Town of Thompson Planning Board · June 24, 2026

Summary

A 50'x90' pole barn for storage of ski-hill and summer-camp equipment at Holiday Mountain was approved; no water or sewer connections will be added and the board classified it as a SEQR Type 2 action not requiring a negative declaration.

The Planning Board approved a site-plan modification at 99 Holiday Mountain Road to construct a 50-by-90-foot pole barn intended to store ski-hill and summer-camp equipment such as jet skis and portable snow guns. Project engineer Glenn Smith noted there will be no bathrooms or running water in the structure, eliminating the need for water or sewer connections and a SWPPP. Attorney Steve Vegliante advised the board that the action is a SEQR Type 2 and does not require a negative declaration.

Board members asked about potential leaks from stored machinery and emphasized any leaks must be addressed properly. Matt Sickler confirmed the submitted elevations are acceptable. Michael Hoyt moved to approve the modification and Christina Cellini seconded; the motion passed unanimously.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source