Selectmen OK Eversource/Verizon pole work on Gammon's Road after location clarified

Acushnet Board of Selectmen · August 6, 2026

Summary

Acushnet selectmen approved a joint Eversource and Verizon petition to locate underground facilities and a new stub hole on Gammon's Road after residents and board members clarified the pole's placement and driveway impacts.

The Acushnet Board of Selectmen unanimously approved a petition from Eversource Energy and Verizon New England on Aug. 5 to locate underground conduit and a joint on pole in the right-of-way of Gammon's Road (work order 26973732).

Jessica Elder explained that the new joint would serve a property at 127 and that the pole/pedestal appeared to sit opposite the road from the residence. A neighbor and board members asked whether the pole would obstruct driveways or sight lines; staff and the petitioner confirmed it would sit "in the woods" and not directly obstruct driveways. After those clarifications the board closed the hearing and voted to accept the request.

The board asked staff to ensure the exact placement is validated in the field and that the utility coordinates restoration of the public way. The motion passed by roll call with all members present voting yes.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source