Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Maintenance topic

No spam. Unsubscribe anytime.

Maintenance warns test cart-path material failed; road base recommended

White Pine County Golf Advisory Board · January 26, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Cole Burdick reported that the test cart-path material performed poorly — becoming dusty when dry and tacky when wet — and said Martin Trout of the road department recommended installing a road base; the cost of the road base is not yet determined.

Cole Burdick, the golf-course maintenance lead, told the board that a test section of cart path did not perform as expected and recommended further work to find a durable solution.

"The material used turns to dust when dry and becomes extremely tacky and makes a mess when too wet," Burdick said. He reported that he spoke with Martin Trout at the road department, who recommended placing road base beneath the cart-path material to improve durability. Burdick said the cost of that road base remains to be determined, and the board requested additional cost estimates and updates at a future meeting.

The minutes also list new signage discussion; no specific signage designs or budgets were decided at the meeting.