Citizen Portal

Get email alerts on the Water Utility Flow Testing topic

No spam. Unsubscribe anytime.

Water board testing finds Prater Spring flow meter off by about 20%

Town of Star Valley Ranch Town Council · November 12, 2024

Summary

Water Utility testing showed Prater Spring flow readings are approximately 20% off; results for Fox Run Well and Well 3 were inconclusive because of pipe-size differences. The Water Utility board will meet Nov. 21 to follow up.

The Water Utility board reported results from recent flow-meter testing and said tests showed Prater Spring was off by about 20 percent. Tests for Fox Run Well and Well 3 were inconclusive due to differences in pipe sizing, the update said.

The Water Utility board has scheduled a follow-up meeting for Nov. 21 at 1 p.m. to review testing methods and determine next steps to correct or recalibrate meters. No corrective actions were adopted during the work session.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source