Board approves $1,114 change order for pre-engineered building adjustments
Aug 10, 2026
Supervisors approved change order number 4 for $1,114 related to final pre-engineered metal building details; county staff said plan adjustments produced a small net credit after review.
The full story
The Muscatine County Board of Supervisors approved change order number 4 on Aug. 10, a $1,114 adjustment tied to final details in the county's pre-engineered metal building design. County development director Eric Furnace said the final design reduced some glazing and produced a credit that left a small net increase.
Furnace described the process: “when we got the final pre engineered metal building design ... we lost some transit at height on 1 of the storefronts ... it came in at a small increase,” he said, adding staff pursued more detail and ultimately obtained credit. A supervisor moved and seconded approval and the chair announced the motion carried; the transcript records the approval but does not provide a full roll-call tally.
Furnace called out the value of in-house project management and staff capacity to review CAD drawings and secure cost savings. The board then moved on to other facility project updates.
Written with AI from the event video and transcript. Check it against the source ↓
