Citizen Portal

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Engineer updates: building renovation progress and Victory Road bridge replacement noted

Clinton Township Board of Supervisors · September 12, 2024

Summary

A written report from Redcon Engineering, read by Township Director Ashley Kohley, included updates on the municipal building renovation and the Victory Road Bridge replacement; the board voted to accept the engineer's report at the Aug. 26 meeting.

Director Ashley Kohley read the engineer's written report from Redcon Engineering, which included updates on the Building Renovation Project and the Victory Road Bridge Replacement.

The minutes do not include technical details, cost estimates, or a construction schedule in the meeting record; the board approved the engineer's report as part of a motion to accept committee and engineer reports.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source