Planner flags technical inconsistencies in draft: units, installation depth and nitrogen limits

Aug 14, 2026

Chris White identified inconsistent bacteriological units (microliters vs milliliters), conflicting installation-depth specs (7 vs 8 inches) and inconsistent total nitrogen limits (≤15 mg/L vs 10–15 mg/L) and recommended consulting TDEC and adopting single enforceable limits in the technical manual.

The full story

Chris White told the committee he found several technical inconsistencies in the draft that should be resolved before final adoption. He noted sections that used different bacteriological units (micro-liters versus milliliters) and said the draft should be consistent. He also identified a conflict where one section specified drip lines at 7 inches below finished grade while another said 8 inches; White recommended an approved range such as 7–8 inches or consultation with TDEC to set a standard.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in