Get email alerts on the Infrastructure Maintenance topic
No spam. Unsubscribe anytime.
Board approves MRI contracts for diving clean ($65,000) and rip-rap ($5,800)
Summary
MRI Inspection LLC proposals to use divers for heavily blocked structures ($65,000) and rip-rap installation at CB-130 ($5,800) were approved unanimously. The board corrected a line-item location (CB-130) before voting.
Get email alerts on the Infrastructure Maintenance topic
No spam. Unsubscribe anytime.
Brenda Radford of MRI Inspection LLC presented two proposals to the River Ridge Board May 26: Estimate #6583 to use divers on structures with blockage of 25% or higher, and Estimate #6604 for rip-rap installation. The board corrected the rip-rap location (work will be in CB-130, not CB-139) and then approved both estimates.
The minutes record that MRI Estimate #6583 for cleaning, in the amount of $65,000, was approved on a motion by Supervisor Kurt Blumenthal and seconded by Supervisor Robert Twombly. The rip-rap installation for CB-130 (Estimate #6604) in the amount of $5,800 was approved on a motion by Chair Bob Schultz and seconded by Mr. Twombly; both motions passed "with all in favor."
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
