Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Roadmaster reports winter response, bridge damage after equipment move
Summary
Roadmaster Rick Macklem told the board the township cleared four snow storms, removed downed trees and logged an oil change; he also said contractor video shows a bridge on West Side Road was damaged after EQM bonded the road and moved equipment on Feb. 17, 2026.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Roadmaster Richard Macklem reported winter maintenance activities, including snow removal across four storms, application of anti-skid materials, removal of downed trees and an inspection with the first oil change of the season. He also told the supervisors that HRI vacated the Trading Post on Feb. 17, 2026.
Macklem said a contractor identified in the minutes as 'EQM' bonded West Side Road and that the township received before-and-after video showing the bridge was damaged during the initial move. The minutes do not include the contractor's full contact information or a cost estimate for repairs; correspondence elsewhere in the record lists 'EQT ARO LLC' as a Notice of Intent related to consumptive use on CO Tr 728C.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
