Citizen Portal

Get email alerts on the Bridge Replacement topic

No spam. Unsubscribe anytime.

Comanche County OKs PEC contract to design replacement for Bridge BR‑13179‑6751

Board of Comanche County Commissioners · August 10, 2026

Summary

The board approved a two‑year master services agreement with Professional Engineering Consultants, P.A. (PEC) to design replacement of bridge BR‑13179‑6751 in District 1, replacing a 30‑foot single‑span steel multi‑beam bridge with a new concrete beam bridge and approach improvements.

The Comanche County Board approved a Master Services Agreement with Professional Engineering Consultants, P.A. (PEC) to provide design services for the replacement of Bridge BR‑13179‑6751 in District 1. The project scope in the record specifies replacing a 30‑foot single‑span steel multi‑beam bridge with a concrete beam bridge and improvements to roadway approaches; the agreement term is two years (PEC Project No. 250506‑000, Work Order No. 26‑01).

The contract was recorded on the consent agenda and approved without separate recorded opposition. The minutes do not list a dollar amount for PEC’s work; procurement documents and the work order number were entered into the record for contract administration and future invoicing.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source