Draft ordinance specifies setbacks, fencing and stacking requirements for propane/LPG facilities
Apr 16, 2025
Planners reviewed draft definitions and standards for propane/LPG filling and service facilities, including 35-foot street setbacks, 100-foot separation from occupied structures for aboveground tanks, required bollard protection and fencing, and minimum vehicle stacking or extra parking spaces for on-site filling.
The full story
The commission reviewed a draft code section for Propane/LPG Filling and/or Service Facilities that would permit the use in the Industrial district and by special exception in AG and R zones. Proposed safety and siting standards include a 35-foot setback from the street right-of-way for fuel tanks, a minimum 100-foot separation between aboveground tanks and occupied structures on other lots, concrete bollard protection on street sides, and an eight-foot fence and screening around outdoor storage or mechanical equipment.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →