Citizen Portal

Get email alerts on the Stormwater Infrastructure topic

No spam. Unsubscribe anytime.

Board approves MRI Construction proposal to widen E3 Basin control structure for $3,500

River Ridge Community Development District Board of Supervisors · March 24, 2026

Summary

The River Ridge Board approved MRI Construction Proposal #606 to widen the E3 Basin control-structure weir to maximum width for improved outflow, in the amount of $3,500; the board requested before-and-after photos and asked staff to inquire about installing a manual gate.

Mrs. Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Charlie Krebs explained the plan: the current control structure near the FPL easement is slightly shy of maximum width and MRI would use a concrete saw to widen the weir to the maximum to increase outflow.

"On MOTION by Mr. Blumenthal and seconded by Mr. Schultz, with all in favor, MRI Construction Proposal #606 to widen the opening on the E3 Basin Control Structure, in the amount of $3,500, was approved," the minutes record. Mr. Krebs said he would provide before-and-after photographs, send project details and specifications to the Board, and inquire about installing a manual gate near the control structure.

The motion passed unanimously. Board members discussed scope of work and whether a manual open/close gate could be installed as part of or subsequent to the project.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source