Get email alerts on the Lake Maintenance topic
No spam. Unsubscribe anytime.
River Ridge approves $65,000 diver cleaning and $5,800 rip-rap installation
Summary
The Board approved MRI Inspection LLC Estimate #6583 for diver cleaning at $65,000 and Estimate #6604 for rip-rap installation in CB‑130 for $5,800; both motions passed unanimously.
Get email alerts on the Lake Maintenance topic
No spam. Unsubscribe anytime.
Brenda Radford of MRI Inspection LLC presented two proposals: Estimate #6583 to use divers to clean structures with 25% or greater blockage, and Estimate #6604 to install rip‑rap in CB‑130 (the transcript corrects the work location from CB‑139 to CB‑130).
The Board approved the cleaning proposal and the rip‑rap installation. The minutes record: "On MOTION by Mr. Blumenthal and seconded by Mr. Twombly, with all in favor, MRI Estimate #6583 for cleaning, in the amount of $65,000, was approved." Similarly, the rip‑rap installation motion passed: "On MOTION by Mr. Schultz and seconded by Mr. Twombly, with all in favor, MRI Estimate #6604 for CB‑130 Rip Rap Installation, in the amount of $5,800, was approved." Staff will coordinate scheduling with MRI and record work completion.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
