A town engineering/building official told the board that average daily wastewater flow rose to about 62,000 gallons per day, roughly 10,000 gpd higher than normal; leak detection is underway but the source has not been found.

The town's building/engineering representative reported that average daily wastewater flow for the month increased to about 62,000 gallons per day — roughly 10,000 gpd above normal — and that staff have not yet located the source. "Average daily flow for the month is increased to 62,000 gallons a day so it's about 10,000 gallons a day higher than normal," the inspector said, and described systematic quadrant‑by‑quadrant leak investigation and use of acoustic leak‑detection equipment.

The inspector noted the difficulty of finding small service line leaks, saying it could be ‘‘something as small as a half‑inch hole in a pipe in a service line’’ and that staff would continue surveys in coming months. The board acknowledged the need for continued detection efforts and public reporting of visible water to aid investigations; no specific remediation measure or capital expense was adopted at the meeting.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source