Council opens stormwater RFP responses after CDM Smith inspection finds pipe needs
Sep 15, 2025
Sep 15, 2025
Council opened stormwater RFP responses; President Dooley and consultant Frank Tarquinio will evaluate responses. Dooley said a CDM Smith inspection found the borough needs 12,000 linear feet of galvanized or injected pipe for repairs.
The full story
Milford Borough opened responses to a stormwater engineering RFP at the Sept. 15 meeting and noted a recent inspection by CDM Smith that identified major pipe needs.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
or
Free account
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →