Council opens stormwater RFP responses after CDM Smith inspection finds pipe needs

Sep 15, 2025

Council opened stormwater RFP responses; President Dooley and consultant Frank Tarquinio will evaluate responses. Dooley said a CDM Smith inspection found the borough needs 12,000 linear feet of galvanized or injected pipe for repairs.

The full story

Milford Borough opened responses to a stormwater engineering RFP at the Sept. 15 meeting and noted a recent inspection by CDM Smith that identified major pipe needs.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in